On July 25, 2002 the City was notified by Pierce County bridge
inspects of their concerns regarding deterioration of the timber piles
supporting the South Wasson Lane bridge over the South Fork of the
Kinnickinnic River located between Cascade Avenue and Cemetery Road. The
City of River Falls became owners of this bridge when the Wisconsin
Department of Transportation built the STH 65 bypass in 1993. Prior to
construction of the bypass, this bridge was located on STH 65. In
response to the concerns, the City of River Falls retained Bonestroo,
Rosene, Anderlik, and Associates to conduct an inspection of the
structure, and determined the safe load-carrying capacity of this
bridge. The report from Bonestroo and Associates indicated that this
structure should be posted with load restrictions, and appropriate
signage for load limits was installed. In a resolution dated August 27,
2002, the Common Council of the City of River Falls asked for assistance
and cooperation from Pierce County to replace the Wasson Lane Bridge
over the South Fork using State bridge funds. On February 25, 2004, the
City was notified that $709,000 had been approved in the 2005-2007 STP
Local Bridge Program for replacement of the Wasson Lane Bridge.
PROJECT FUNDING
Federal funding will pay for 80% of the cost for this project.
$709,000 had been approved in the 2005-2007 STP Local Bridge Program for
replacement of the Wasson Lane Bridge. The City of River Falls CIP for
2005 and 2006 includes proposed funding for the local 20% match.
PROJECT DESCRIPTION
South Wasson Lane currently serves as a minor arterial street for the
City of River Falls, and plays an important role in the local
transportation network. It is one of the main roads used to access the
River Falls High School which opened in the fall of 2001, and carries
many school buses daily throughout the school year. The new bridge will
include a 36' wide roadway, a 16' wide trail on the west side, and a 6'
sidewalk on the east side. The
posted speed limit on South Wasson Lane is 35 miles per hour.
SCHEDULE REQUIREMENTS
Due to state budget constraints, this project was moved to the 2008-2009 STP
Local Bridge Program timeframe. Bids have been received and a contract
awarded to Ruzic Construction in the amount of $754,000 for this
project. Construction is expected to begin in May, 2008 and
continue through the summer. The bridge will be closed during
construction.